ၾၢႆႇငဝ်ႈတိုၼ်း(2,100 × 1,327 pixels, တၢင်းလဵၵ်ႉတၢင်းယႂ်ႇ ၾၢႆႇ: 1.56 MB, ယိူင်ႈ MIME: image/jpeg)

ၾၢႆႇဢၼ်ၼႆႉ လုၵ်ႉတီႈ Wikimedia Commons သေ တေၸၢင်ႈၵႂႃႇၸႂ်ႉ တီႈပရေႃးၵျႅၵ်ႉတၢင်ႇဢၼ်။ ဢၼ်တႅမ်ႈၼႄ တီႈၼႂ်း file description page ၼၼ်ႉ တေၼႄပၼ် တီႈတႂ်ႈၼႆႉ။

ၵႂၢမ်းယေႃး

ၶေႃႈသပ်းလႅင်း
English: Members of the 27th Expeditionary Aircraft Maintenance Unit completed the first accelerated packaged maintenance plan on an F-22 Raptor in a deployed environment Aug. 4, 2010, at Andersen Air Force Base, Guam. The unit had 10 days to complete a process that normally takes up to a month.
ဝၼ်းထီႉ
ငိူၼ်ႈငဝ်ႈတိုၼ်း http://www.af.mil/shared/media/photodb/photos/090309-F-6911G-307.jpg
ၽူႈတႅမ်ႈလိၵ်ႈ U.S. Air Force photo by Master Sgt. Kevin J. Gruenwald

ဝ်ႂ

Public domain
This image or file is a work of a U.S. Air Force Airman or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, the image or file is in the public domain in the United States.

العربية  беларуская (тарашкевіца)  català  čeština  Deutsch  English  español  eesti  فارسی  suomi  français  italiano  日本語  한국어  македонски  മലയാളം  မြန်မာဘာသာ  norsk bokmål  Plattdüütsch  Nederlands  polski  português  português do Brasil  русский  sicilianu  slovenčina  slovenščina  српски / srpski  svenska  Türkçe  українська  Tiếng Việt  中文(简体)  中文(繁體)  +/−

Captions

Add a one-line explanation of what this file represents

Items portrayed in this file

depicts English

inception English

9 မၢတ်ႉၶျ် 2009

captured with English

Nikon D3 English

exposure time English

0.002 second

f-number English

14

focal length English

120 millimetre

ISO speed English

250

media type English

image/jpeg

instance of English

photograph English

ပိုၼ်းၾၢႆႇ

တဵၵ်းၼိူဝ် ဝၼ်းထိ/ၶၢဝ်းယၢမ်း တႃႇႁၼ်ၾၢႆႇ ၼႂ်းဝၼ်းၼၼ်ႉ

ဝၼ်းထီႉ/ၶၢဝ်းယၢမ်းႁၢင်ႈလဵၵ်ႉသႅၼ်းမၼ်းၽူႈၸႂ်ႉတိုဝ်းတၢင်းႁၼ်ထိုင်
ယၢမ်းလဵဝ်11:12, 7 ဢေႃးၵၢတ်ႉ 2010ၽၢင်ယဵမ်ႈ တွၼ်ႈတႃႇ ဝိူဝ်းသျိၼ်းၼင်ႇ ႁင်း 11:12, 7 ဢေႃးၵၢတ်ႉ 20102,100 × 1,327 (1.56 MB)DeffiSK~commonswiki{{Information |Description={{en|1=Members of the 27th Expeditionary Aircraft Maintenance Unit completed the first accelerated packaged maintenance plan on an F-22 Raptor in a deployed environment Aug. 4, 2010, at Andersen Air Force Base, Guam. The unit ha

လွင်ႈၸႂ်ႉတိုဝ်းၾၢႆႇလူမ်ႈၽႃႉ

မႄႇတႃႇတေႇတႃႇ